Comments
yourfanat wrote: I am using another tool for Oracle developers - dbForge Studio for Oracle. This IDE has lots of usefull features, among them: oracle designer, code competion and formatter, query builder, debugger, profiler, erxport/import, reports and many others. The latest version supports Oracle 12C. More information here.
Cloud Expo on Google News
SYS-CON.TV
Cloud Expo & Virtualization 2009 East
PLATINUM SPONSORS:
IBM
Smarter Business Solutions Through Dynamic Infrastructure
IBM
Smarter Insights: How the CIO Becomes a Hero Again
Microsoft
Windows Azure
GOLD SPONSORS:
Appsense
Why VDI?
CA
Maximizing the Business Value of Virtualization in Enterprise and Cloud Computing Environments
ExactTarget
Messaging in the Cloud - Email, SMS and Voice
Freedom OSS
Stairway to the Cloud
Sun
Sun's Incubation Platform: Helping Startups Serve the Enterprise
POWER PANELS:
Cloud Computing & Enterprise IT: Cost & Operational Benefits
How and Why is a Flexible IT Infrastructure the Key To the Future?
Click For 2008 West
Event Webcasts
Caledonia Mining Corporation-Strategy Update: Blanket Mine Expects To Increase Gold Production By 90%

TORONTO, ONTARIO -- (Marketwire) -- 01/09/13 -- Caledonia Mining Corporation ("Caledonia" or the "Company") (TSX:CAL)(OTCQX:CALVF)(AIM:CMCL) provides an update on its strategic objective to increase gold production from current NI 43-101 compliant resources at the Blanket Mine in Zimbabwe ("Blanket") to approximately 76,000 ounces of gold per annum (oz pa) by 2016, a 90% increase on Blanket's targeted gold production for 2013 of approximately 40,000oz.

As a fully indigenised entity, Blanket can now develop and implement its long term growth strategy. Blanket's newly re-constituted Board of Directors, which includes representatives of the Indigenous Zimbabwean shareholders, has approved a budget for 2013 and strategic plan which covers the period 2013 to 2017.

Highlights


--  Blanket's highly efficient metallurgical plant has considerable surplus
    capacity: Blanket can process substantial volumes of additional ore with
    only a modest investment required to upgrade the existing crushing and
    milling circuits; 

--  Development of the existing ore resources above and below the current
    lowest mining level (750m) at Blanket has started and is planned to
    produce an additional 36,000oz pa of gold by 2016: 
    --  12,000oz pa planned to start in Q1 2014 from further development at
        the Blanket mine above the 750 m level; 
    --  24,000oz pa planned to start in Q4 2015 from the No. 6 Winze Project
        below the 750m level; 
    --  The above results in a combined 90% increase to 76,000oz pa from
        Blanket's targeted 2013 gold production of approximately 40,000oz; 

--  Increased production is also expected to come from the first three of
    Blanket's portfolio of 18 satellite properties which are expected to
    commence production in Q4 of 2013. The eventual rate of production from
    these properties will be determined by the success of on-going
    exploration and mining development work. Production from these
    properties has not been included in the 76,000oz gold target as the
    resources are undefined at present; 

--  Blanket's total capital investment between 2013 and 2017 is anticipated
    to be approximately US$37 million: 
    --  Funded entirely from Blanket's internal cash flows; 
    --  Modest initial investments and early cash flows will enhance
        Blanket's financial performance; and 

--  Subject to achieving successful exploration results at Blanket below
    750m and the sequential development of Blanket's remaining satellite
    properties a longer term potential exists for further increases in gold
    production. 

Surplus Plant Capacity

Since Caledonia purchased Blanket in early 2006, it has ensured, with an eye to the future, that all the numerous plant upgrades it has designed and installed at Blanket, have resulted, not only in a highly efficient operation, but also in substantial surplus capacity in its hoisting and carbon-in-leach ("CIL") circuit. Blanket's current gold production of approximately 40,000oz pa equates to throughput of 1,000 tonnes per day ("tpd"). Blanket currently has hoisting capacity of 3,000tpd and CIL circuit capacity of 3,500tpd. Blanket's crushing capacity will be increased to 3,000tpd after minor amendments to the crushing circuits; the existing milling capacity of 1,460tpd will be increased to 2,900tpd following the budgeted investment of $850,000 on new rod mills. Accordingly, Blanket will be able to process a substantial amount of additional compatible ore following the planned increases in the capacity of the crushing and milling circuits.

Caledonia has two approaches to accessing additional ore:

(i) exploration and subsequent development at Blanket's satellite properties, and

(ii) down-dip exploration and development at the Blanket Mine.

Work has already commenced on development projects at Blanket which are expected to progressively give rise to increased annual gold production of 36,000oz pa. The first increase in gold production is expected in early 2014, and the targeted 36,000oz increase is expected to be achieved in 2016.

Additional gold production will also spread Blanket's fixed costs over more ounces of gold and could mitigate some of the anticipated increased production costs. The most recent quarter ended September 30th 2012 reported cash costs of $508/oz, the lowest level yet recorded at Blanket.

Increase in Production Funded by Internal Cash Flows

The proposed increase in production at Blanket and the exploration and pre-production development of the first three satellite projects will require a capital investment of approximately $4.7 million in addition to the normal planned capital expenditures required to sustain operations at Blanket. The total budgeted and projected sustaining and development capital investment at Blanket from 2013 to 2017 will be approximately $37 million, all of which is expected to be funded from Blanket's internal cash flows. Subject to the strategic plan projections, including future ore production, the price of gold and operating costs, and the company's ability to adhere to the implementation timeline, both Blanket and Caledonia expect to continue to pay dividends throughout this period.

Two Part Growth Strategy Comprising:

1. Exploration and Development at Satellite Properties

Blanket holds 18 licenced satellite exploration properties, the furthest of which is 42 km from Blanket's plant, on which there has been some small-scale historic gold mining activity. Any ore mined from the satellite properties will be crushed and transported to Blanket for processing in Blanket's metallurgical plant.

Three satellite properties, GG, Mascot and Eagle Vulture, are currently undergoing exploration and underground development work.


--  GG: This project is 7 km from Blanket, connected by an existing un-paved
    road, and was previously a small, shallow, open-pit operation. In 2012,
    work started on sinking a shaft to 120m which will be used for
    underground exploration, development and production. The shaft has
    currently been sunk to a depth of 60m and work has commenced on
    excavating the first development level at 60m below surface. Further
    stations will be cut at the 90m and 120m levels. In the process of
    sinking the shaft, gold mineralization has been intersected between 40
    and 60 metres below surface with grab-sample gold grades of between
    3.5g/t and 6.0g/t. Budgeted pre-production investment at GG for 2013 is
    about $422,000;  
    
--  Mascot: This project is 42 km from Blanket, mostly connected by a paved
    road, and was previously mined down to 300m below surface. Drilling
    undertaken by Blanket indicated the existence of two mineralised zones
    50 to 70 metres on either side of the mined out area with gold grades of
    between 3.5g/t to 4.6g/t. The existing shaft at Mascot has now been re-
    accessed down to 180m below surface and has been found to be in good
    condition. Development work will commence towards the two identified
    mineralised zones. Budgeted pre-production investment at Mascot for 2013
    is $366,000;  
    
--  Eagle Vulture: This project is 40km from Blanket, mostly connected by a
    paved road, and was previously mined down to 70m below surface. Surface
    exploration work undertaken by Blanket indicated the existence of two
    extensive, un-mined mineralised zones on either side of the old mine
    working zone. Development has commenced towards the identified
    mineralised zones. Budgeted and projected pre-production investment at
    Eagle Vulture is $702,000.  

GG and Mascot are expected to commence production in Q4 2013 whilst production at Eagle Venture is anticipated to commence in early 2015. The eventual production rate from GG, Mascot and Eagle Vulture and their life-of-mine will be determined once exploration and development work and metallurgical test-work on the mined mineralization has been completed and a resource base has been identified.

Two further satellite properties have been identified for near-term development: Abercorn, which is approximately 20km from Blanket, and Sabiwa, which is adjacent to Blanket but is not connected to Blanket's underground infrastructure. The combined budgeted investment at Sabiwa and Abercorn in 2013 is $1,269,000; further investment of $4.5 million is projected for the four years 2014 to 2017. No guidance as to future production levels from Sabiwa and Abercorn can be provided until exploration work has been completed.

2. Exploration and Development at Blanket

Exploration and development at Blanket is focused on the following projects:


--  No.6 Winze Project: The deepening of the No. 6 Winze to the 1,080m level
    will allow more rapid access to the Blanket ore body below the 750m
    level. The pre-production investment in this project is estimated to be
    US$3.0 million. Work on this project has commenced. Production is
    expected to start in Q4 2015 and progressively increase to approximately
    600tpd, which will give rise to incremental gold production of
    approximately 24,000oz pa. This production will be in addition to the
    target production from other areas of Blanket mine of 1,200 tpd (or
    approx. 48,000oz gold per annum) following completion of the extensions
    of the 510-Level and 630-Level Haulages;  
    
--  510 and 630-Level Haulages: These projects will open up new mining areas
    on known resources at AR South and Lima and will allow a 200tpd increase
    in ore production commencing in Q1 of 2014 increasing to 300tpd in 2015
    and should result in gold production of approximately 8,000oz in 2014
    and a further 4,000oz in 2015; and  
    
--  750-Level Haulage: This project will connect the No. 4 Shaft with the
    known ore bodies at Eroica and Lima on 22-Level (750m below surface) and
    will provide access for mining at Eroica and Lima between 630m and 750m
    below surface. Cross-cuts from the 750 Level Haulage will provide
    platforms for further exploration of the existing ore bodies above and
    below 750m. It is envisaged that the 750-Level Haulage and related
    exploration will be completed by 2016. Budgeted investment on the 750-
    Level Haulage and related exploration drilling for 2013 is $669,000 and
    $261,000 respectively. Projected further investment on the 750-Level
    Haulage in the years 2014 to 2017 is $2,188,000. No guidance as to
    future production arising from this project can be provided until the
    exploration work and subsequent feasibility study have been completed.  

Further information regarding Caledonia's exploration activities and operations along with its latest financials and Management Discussion and Analysis may be found at www.caledoniamining.com.

Contacts:
Caledonia Mining Corporation
Mark Learmonth
+ 27 11 447 2499
marklearmonth@caledoniamining.com
www.caledoniamining.com

Canaccord Genuity Limited
Andrew Chubb/Sebastian Jones
+ 44 20 7523 8000

Newgate Threadneedle
Beth Harris/Adam Lloyd
+44 20 7653 9850

CHF Investor Relations
Jeremy Hill
+1 416 868 1079 x 222
jeremy@chfir.com

About Marketwired .
Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Cloud Developer Stories
14th International Cloud Expo, held on June 10–12, 2014 at the Javits Center in New York City, featured three content-packed days with a rich array of sessions about the business and technical value of cloud computing, Internet of Things, Big Data, and DevOps led by exceptional s...
Connected cars, factory equipment and household products communicating over the Internet is increasingly becoming a reality – one that might soon elicit headlines like “Is the Internet of Things a big bust?” That’s because it’s one thing to connect a device to the Internet and d...
Explosive technological advancement has created a molten landscape of disruption, reinvention and creation. New services arrive and become versatile building blocks for new ideas, products and businesses. As intuitive and intelligent technology relieves us of administrative burde...
SYS-CON Events, Inc. named Cisco "Gold Sponsor" of upcoming Cloud Expo, co-located with 3rd International Internet of @ThingsExpo, the largest IoT event in the world. 15th International Cloud Expo will take place November 4-6, 2014 at the Santa Clara Convention Center in Santa Cl...
Internet of @ThingsExpo, taking place Nov 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 15th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The Internet of...
Subscribe to the World's Most Powerful Newsletters
Subscribe to Our Rss Feeds & Get Your SYS-CON News Live!
Click to Add our RSS Feeds to the Service of Your Choice:
Google Reader or Homepage Add to My Yahoo! Subscribe with Bloglines Subscribe in NewsGator Online
myFeedster Add to My AOL Subscribe in Rojo Add 'Hugg' to Newsburst from CNET News.com Kinja Digest View Additional SYS-CON Feeds
Publish Your Article! Please send it to editorial(at)sys-con.com!

Advertise on this site! Contact advertising(at)sys-con.com! 201 802-3021



SYS-CON Featured Whitepapers
ADS BY GOOGLE

Breaking Cloud Computing News

NEW YORK, Aug. 21, 2014 /PRNewswire/ -- AT&T today announced a $1 million contribution to Gir...