Comments
yourfanat wrote: I am using another tool for Oracle developers - dbForge Studio for Oracle. This IDE has lots of usefull features, among them: oracle designer, code competion and formatter, query builder, debugger, profiler, erxport/import, reports and many others. The latest version supports Oracle 12C. More information here.
Cloud Expo on Google News
SYS-CON.TV
Cloud Expo & Virtualization 2009 East
PLATINUM SPONSORS:
IBM
Smarter Business Solutions Through Dynamic Infrastructure
IBM
Smarter Insights: How the CIO Becomes a Hero Again
Microsoft
Windows Azure
GOLD SPONSORS:
Appsense
Why VDI?
CA
Maximizing the Business Value of Virtualization in Enterprise and Cloud Computing Environments
ExactTarget
Messaging in the Cloud - Email, SMS and Voice
Freedom OSS
Stairway to the Cloud
Sun
Sun's Incubation Platform: Helping Startups Serve the Enterprise
POWER PANELS:
Cloud Computing & Enterprise IT: Cost & Operational Benefits
How and Why is a Flexible IT Infrastructure the Key To the Future?
Click For 2008 West
Event Webcasts
Initial Results Received from Expansion Drilling of Preview SW Deposit, Saskatchewan; Met Work and PEA Started

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 02/04/13 -- La Ronge Gold Corp. (TSX VENTURE:LAR) -

HIGHLIGHTS


--  Eight Drill holes completed to date within the pit shell; 
--  First two drill holes expand mineralized zones to the northeast for 206
    metres (m) outside the current block model; 
--  Metallurgical Test work to commence shortly; 
--  Mineral Resource Estimate update and Preliminary Economic Assessment
    (PEA) to commence in Q2 of 2013. 

La Ronge Gold Corp. (TSX VENTURE:LAR) (the "Company") is pleased to announce that assays have been received from the first two widely spaced step-out drill holes about 200 m outside the current block model at the Preview SW deposit located in north-central Saskatchewan:

Drill hole PR13-144 intersected:


--  2.75 grams/tonne gold (g/t Au) over 14.81 m starting at 131.51 m
    Including 6.45 g/t Au over 4.81 m 
--  2.05 g/t Au over 8.40 m starting at 177.75 m 

Drill hole PR13-145 intersected:


--  3.25 g/t Au over 5.45 m starting at 63.50 m 
--  3.94 g/t Au over 2.46 m starting at 95.80 m 

The primary objective of this drilling campaign is to expand the recently announced gold resources at the Preview SW deposit towards the northeast and southwest of the deposit. As reported in a News Release dated December 3, 2012, the Preview SW gold deposit hosts gold resources as summarized in the table below, using the base case estimate at a gold cut-off grade of 0.5 grams/tonne gold (g/t Au):


                                                                            
----------------------------------------------------------------------------
                          Preview SW Gold Resources                         
----------------------------------------------------------------------------
                                                       Au          Contained
Category                          Tonnes              g/t              oz Au
----------------------------------------------------------------------------
----------------------------------------------------------------------------
INDICATED                      1,958,400             2.12            138,100
INFERRED                       3,714,600             2.09            257,300
----------------------------------------------------------------------------
                                                                            
         If you cannot view the table above please follow this link:        
    http://www.larongegold.com/projects/saskatchewan/preview-sw/drilling-   
                                 resources/.                                

The deposit remains open in all directions. The current drill program is designed to test near surface gold mineralization outside the current resource model. Please follow this link to view the current area of drilling: http://www.larongegold.com/wp-content/uploads/2013/02/PitShell-Zones-Feb-4-2013.jpg.

To view the 2013 Preview SW drillhole plan map please follow this link: http://www.larongegold.com/wp-content/uploads/2013/02/PSW-Drillhole-Plan-Map-Feb-4-2013.pdf. The Company has completed eight core drillholes to-date and drilling will continue to the northeast and southwest of the deposit.

A complete summary of selected mineralized intercepts from holes PR13-144 to -145 is given below:


                                                                            
----------------------------------------------------------------------------
Hole #                   Au (g/t)      Width (m)       From (m)       To (m)
----------------------------------------------------------------------------
PR13-144                     1.68           2.23          45.62        47.85
----------------------------------------------------------------------------
                             1.42           5.50         109.70       115.20
----------------------------------------------------------------------------
                             2.75          14.81         131.51       146.32
----------------------------------------------------------------------------
  including                  6.45           4.81         141.51       146.32
----------------------------------------------------------------------------
                             2.05           8.43         177.75       186.18
----------------------------------------------------------------------------
PR13-145                     3.25           5.45          63.50        68.95
----------------------------------------------------------------------------
                             3.94           2.46          95.80        98.26
----------------------------------------------------------------------------
                                                                            
         If you cannot view the table above please follow this link:        
    http://www.larongegold.com/wp-content/uploads/2013/02/Feb4-2013-News-   
                             Release-Table.jpg.                             

Mineralized intervals are based on samples that vary in width from 0.6 m to 1.5 m utilizing 0.20 g/t gold cut-off levels with a maximum internal dilution of 2.0 metres. The attitude of mineralized intervals varies, and reported mineralized intersections may not represent true widths. Maps of the current drilling are posted on La Ronge Gold's website at: http://www.larongegold.com/projects/saskatchewan/preview-sw/drilling-resources/.

In addition to the current exploration/expansion drilling at Preview SW deposit, the Company will be submitting mineralized drill core for metallurgical studies. Preliminary engineering studies and base line environmental surveys will continue in 2013, and an updated resource estimate incorporating the results from this winter's drilling campaign will then become a part of a Preliminary Economic Analysis (PEA) on the Preview SW Deposit. This PEA will commence in the second quarter of 2013 and should be completed before year-end.

Company President and CEO Rasool Mohammad comments: "Most of the drill holes we will be completing in this program are designed to explore for and define additional resources. Our short-term goal is to de-risk the project through metallurgical studies followed by a PEA."

There are seven known gold prospects on the Property: from north to south they are North/Adit, C, B, Preview SW, Clearwater A, and Clearwater B. In all zones, structurally controlled mesothermal lode gold is found in quartz veins within or on the margins of sheared dioritic-gabbroic sills and is associated with sulphides. The area of diorite-gabbro sills extends for 5200 m in a northeast-southwest direction across the property and reaches approximately 200 m in width.

The main Preview SW deposit is comprised of several sub-parallel northeast-trending gold-bearing structural zones. The shears trend northeast (020 degrees to 045 degrees) and dip 70 degrees to 90 degrees to the northwest. The en-echelon 1 to 10 m-wide structures are persistent at depth, and the zones bifurcate and merge at depth and along their length. The shears comprise major and minor shears that splay out and merge to form "horses" of undeformed rock within the shear zone.

Samples of sawn drill core were analyzed by TSL Laboratories in Saskatoon with fire assay techniques. La Ronge Gold has implemented an industry standard QA/QC program consisting of randomly inserted standards, blanks, and duplicates into the sample stream to ensure assay accuracy and repeatability.

Gordon Davidson, P. Geol., the Company's Vice President of Exploration and a Qualified Person for the purposes of National Instrument 43-101, has reviewed the technical information in this News Release.

About La Ronge Gold Corp.

La Ronge Gold is a Vancouver-based rapidly advancing gold-resource growth and development company, focused on the expansion of high-grade gold deposits in one of Canada's emerging gold producing regions, the La Ronge Gold Belt, northern Saskatchewan. The Company has significant land positions (52,932 Ha. or 131,000 acres) in the region. The Company also holds other gold projects located in Ontario, Canada.

For more information about La Ronge Gold Corp., please go to www.larongegold.com.

FORWARD-LOOKING INFORMATION

This News Release includes forward-looking information and statements, which may include, but are not limited to, information and statements regarding or inferring the future business, operations, financial performance, prospects and other plans, intentions, expectations, estimates, and beliefs of the Company. Information and statements which are not purely historical fact are forward-looking statements. Forward-looking information and statements involve and are subject to assumptions and known and unknown risks, uncertainties, and other factors which may cause actual events, results, performance, or achievements of the Company to be materially different from future events, results, performance, and achievements expressed or implied by forward-looking information and statements herein. Although the Company believes that any forward-looking information and statements herein are reasonable, in light of the use of assumptions and the significant risks and uncertainties inherent in such information and statements, there can be no assurance that any such forward-looking information and statements will prove to be accurate, and accordingly readers are advised to rely on their own evaluation of such risks and uncertainties and should not place undue reliance upon such forward-looking information and statements. Any forward-looking information and statements herein are made as of the date hereof, and the Company assumes no obligation and disclaims any intention to update or revise any forward-looking information and statements herein, or to update the reasons that actual events or results could or do differ from those projected in any forward-looking information and statements herein, whether as a result of new information, future events or results, or otherwise.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this Release.

Contacts:
La Ronge Gold Corp.
Rasool Mohammad, B.Sc. (Mining)
President & CEO
(604) 639-4533
info@larongegold.com
www.larongegold.com

About Marketwired .
Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Cloud Developer Stories
More and more enterprises today are doing business by opening up their data and applications through APIs. Though forward-thinking and strategic, exposing APIs also increases the surface area for potential attack by hackers. To benefit from APIs while staying secure, enterprises ...
Red Hat, Inc., has announced the availability of Red Hat JBoss Fuse 6.1 and Red Hat JBoss A-MQ 6.1, its standards-based integration and messaging products. The technologies extend and simplify integration to all facets of the enterprise, including on-premise, hybrid and cloud-bas...
The market is full of buzz about cloud computing, and with it come sweeping claims about simplicity and savings. Deciding to migrate some or all database management to a cloud hosting provider, however, is a more complex undertaking than conventional wisdom may suggest. This wh...
The revolution that happened in the server universe over the past 15 years has resulted in an eco-system that is more open, more democratically innovative and produced better results in technically challenging dimensions like scale. The underpinnings of the revolution were common...
You use an agile process; your goal is to make your organization more agile. What about your data infrastructure? The truth is, today’s databases are anything but agile – they are effectively static repositories that are cumbersome to work with, difficult to change, and cannot ...
Subscribe to the World's Most Powerful Newsletters
Subscribe to Our Rss Feeds & Get Your SYS-CON News Live!
Click to Add our RSS Feeds to the Service of Your Choice:
Google Reader or Homepage Add to My Yahoo! Subscribe with Bloglines Subscribe in NewsGator Online
myFeedster Add to My AOL Subscribe in Rojo Add 'Hugg' to Newsburst from CNET News.com Kinja Digest View Additional SYS-CON Feeds
Publish Your Article! Please send it to editorial(at)sys-con.com!

Advertise on this site! Contact advertising(at)sys-con.com! 201 802-3021



SYS-CON Featured Whitepapers
ADS BY GOOGLE